Learn. Share. Discover | Forum Safran | Oct 30th–31st 2018 | Sola Strand Hotel
We are excited to be hosting Blake Fox, Project Planning Manager at Norway’s largest energy operator, Equinor, as one of three guest speakers at this year’s Forum Safran conference.
Johan Sverdrup – The 5th Largest Oil Field on the Norwegian Continental Shelf
The Johan Sverdrup oil field, which lies 160 kilometres west of Stavanger – the location of Forum Safran – is truly a giant. First discovered in 2010, Johan Sverdrup is expected to hold up to 3 billion barrels of oil and is set to be the largest producing oil field in the North Sea once it starts operations next year.
Once production reaches its peak, the Sverdrup project will constitute 25% of all Norwegian petroleum production and is considered to be one of the most important industrial projects in Norway over the next 50 years.
Blake Fox will be our second speaker at Forum Safran 2018. He is Project Planning Manager for Equinor (formerly Statoil) who are responsible for the mammoth task of managing the Johan Sverdrup megaproject.
With over 20 years’ experience in project management and control, Blake’s expert knowledge, paired with stories of the lessons learned from managing the Sverdrup project, will provide valuable, in-depth information for all those attending. His keynote: Statoil Johan Sverdrup – Lessons Learned After Three Years is not to be missed.
To learn more about how Equinor is managing one the largest oil fields in the North Sea and to hear from other project management experts throughout the event, secure your place at Forum Safran 2018.
Forum Safran brings together professionals from right across the project management and control sector, providing an excellent opportunity to network. There are also plenty of chances to learn, share and discover via informative talks, seminars, and training sessions covering topics ranging from turnaround planning to calculating weather risk during offshore projects.
More information about the event can be found on the official Forum Safran 2018 website.