<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=150057&amp;fmt=gif">
SAP_white-paper-cover

An Integrated approach to SAP project system

Optimizing Complex Schedules 

Optimizing a Project's Moving Parts

Our new whitepaper discusses how the variables of duration, cost, resources, and risk can be best optimized when working with complex schedules in SAP Project System (PS). 

 

In this paper, you'll discover:

  • The boundaries of SAP PS, for managing duration, cost, resources, and risk during complex projects.
  • The business solution to optimizing these four variables.
  • A SAP integration use case: how a global shipbuilding company used an integrated approach to get better results.

 

To download this guide, simply fill in the form.

Download the Whitepaper