title: Managing Uncertainty in Project Schedules LP
description: Our latest download discusses the ways and methods in which uncertainty can be managed in project schedules. In this white paper, we look at the problems that arise from traditional methodology such as the Critical Path Method and how Schedule Risk Analysis can fix these issues.
image: https://www.safran.com/hubfs/SRA%20whitepaper/sracover.png
---

[![Safran - Master Logo](https://www.safran.com/hs-fs/hubfs/60.%20Internal%20-%20Safran%20Branding%20-%200522/60.%20Internal%20-%20Safran%20Branding%20-%200522%20-%20Master%20Logos/Safran%20-%20Master%20Logo.png?width=1047&height=291&name=Safran%20-%20Master%20Logo.png "Safran - Master Logo")](https://www.safran.com/hubfs/60.%20Internal%20-%20Safran%20Branding%20-%200522/60.%20Internal%20-%20Safran%20Branding%20-%200522%20-%20Master%20Logos/Safran%20-%20Master%20Logo.png)

![sracover.png](https://www.safran.com/hs-fs/hubfs/SRA%20whitepaper/sracover.png?width=267&name=sracover.png "sracover.png")

### THE SAFRAN APPROACH TO SCHEDULE RISK ANALYSIS

# **Managing Uncertainty in Project Schedules**

## Understand the risks 

Our new whitepaper discusses the elements of duration uncertainty within project schedules and why schedule risk analysis is becoming an increasingly important concept for project management professionals. It introduces the Monte Carlo method and how it can be applied to project planning. 

 

The document contains information on: 

- Compound Risk
- Critical Path Method 
- Schedule Risk Analysis 
- Three Point simulation
- Monte Carlo method

 