---
title: Safran Project Advanced
description: For those comfortable with day-to-day use of Safran Project, we have developed this 1-day course to introduce some advanced concepts.
---

- NO[+47 4000 4707](tel:+47%204000%204707)
- US[+1 (607) 218 5952](tel:+1%20(607)%20218%205952)
- UK[+44 7747775505](tel:+44%207747775505)

[![Safran - Master Logo](https://www.safran.com/hs-fs/hubfs/60.%20Internal%20-%20Safran%20Branding%20-%200522/60.%20Internal%20-%20Safran%20Branding%20-%200522%20-%20Master%20Logos/Safran%20-%20Master%20Logo.png?width=1047&height=291&name=Safran%20-%20Master%20Logo.png "Safran - Master Logo")](https://www.safran.com/hubfs/60.%20Internal%20-%20Safran%20Branding%20-%200522/60.%20Internal%20-%20Safran%20Branding%20-%200522%20-%20Master%20Logos/Safran%20-%20Master%20Logo.png)

# Safran Project Advanced

For those comfortable with day-to-day use of Safran Project, we have developed this one day course to introduce some advanced concepts. This course aims to give participants a thorough understanding of key components and features of Safran Project.

## Course covers:

Calculation methods, structuring of the scope of work, correlation between time and volume percentages, and an introduction to computer models.

- Scope-definitions and meaning
- Data model
- Plan sets and -concepts
- Timenow
- Time- and Volume progress
- Status Update and baseline
- Reference fields

 

**![Safran Project Advanced Training Course](https://www.safran.com/hs-fs/hubfs/Product_Logos/SFR-Project-logo.png?width=186&name=SFR-Project-logo.png "Safran Project Advanced Training Course")**

 

 

**Location** | Stavanger (Norway)

**Dates** | On request - contact [training@safran.com](mailto:training@safran.com)

**Duration** | 1 day

[< back to events](https://www.safran.com/events)