
By David T. Hulett, PhD FAACE
Author of Integrated Cost-Schedule Risk Analysis
This guide discusses how conducting in-depth analysis can mitigate cost and schedule overruns, with demonstrations of the benefits in practice.
Download the guide to answer the following questions:
The guide then concludes with a summary and breakdown of the benefits with practical examples.
It was created in collaboration with integrated cost-schedule risk analysis expert Dr. David Hulett, who has emerged as a leader in its methods, concepts and training.
To download this e-book, simply fill in the form.
© 2023 Safran, Part of the JDM Technology Group