title: Webinar - Seamlessly Integrating Owner and Contractors’ Project Schedules
description: In this webinar, you can learn how integrating owner and contractors' project schedules delivered dramatic results for Statsbygg's Campus Ås Veterinary Institute Project.
---

[Welcome to Safran's Project and Risk Management Blogs I Safran ](https://www.safran.com/blog)

# [Webinar - Seamlessly Integrating Owner and Contractors’ Project Schedules](https://www.safran.com/blog/upcoming-webinar-seamlessly-integrating-owner-and-contractors-project-schedules)

 Written by [Lars Petter Eliassen](https://www.safran.com/blog/author/lars-petter-eliassen) | 27 February 18

Aproblem often faced by [large-scale projects](https://www.safran.com/case-studies) is how to integrate both owner and contractor schedules into a single, cohesive plan—without granting contractors access to the owner’s IT network.

Traditionally, this has meant manually importing contractor schedules into the master plan, which means a constant battle to keep the schedule updated with the latest information. But what if there was a way to move beyond laborious manual work and allow key contractors to input updates into the schedule directly?

 

 

With [Safran Project](https://www.safran.com/project) running in the [Safran Cloud](https://www.safran.com/cloud), government management company [Statsbygg](http://www.statsbygg.no/) were able to plan and execute the construction of a $1Bn veterinary hospital and research facility with minimal IT headaches. Using Safran Cloud, contractors were able to update the master plan in real time, delivering a fully integrated schedule Statsbygg could be sure was always up to date with the latest information.

We invited **Kåre Johan Haarr from Statsbygg** to join **Safran’s Øyvind Valaker **for a webinar discussing the Campus Ås Veterinary Institute Project. The webinar was followed by a functional demo on how Safran Project's supports the integrated project schedules and solves common project management problems.

## **What We Covered**

The webinar covers the following Project Controls topics:

- Overview of the Campus Ås Veterinary Institute Project
- Brief on integrated planning
- How Statsbygg developed and operated an Integrated Project Plan
- Safran Cloud's benefits on this project
- Functional demo of Safran Project
- Live Q&A

To watch the webinar recording **[click here](https://www.safran.com/integrating-owner-and-contractors-project-schedules-statsbygg-webinar)**.

[View full post](https://www.safran.com/blog/upcoming-webinar-seamlessly-integrating-owner-and-contractors-project-schedules)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Lars Petter Eliassen"
  },
  "dateModified" : "2022-05-20T14:52:04.955Z",
  "datePublished" : "2018-02-27T11:25:00Z",
  "headline" : "Webinar - Seamlessly Integrating Owner and Contractors’ Project Schedules",
  "image" : {
    "@type" : "ImageObject",
    "height" : 385,
    "url" : "https://2405298.fs1.hubspotusercontent-na1.net/hubfs/2405298/General%20Uploads%20to%20Sort/Project-As.jpg",
    "width" : 705
  },
  "mainEntityOfPage" : "https://www.safran.com/blog/upcoming-webinar-seamlessly-integrating-owner-and-contractors-project-schedules",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://2405298.fs1.hubspotusercontent-na1.net/hubfs/2405298/safran-logo-color-2.png",
      "width" : 216.42352
    },
    "name" : "Welcome to Safran's Project and Risk Management Blogs"
  }
}
```