---
title: Planning Concepts
description: A new introduction to basic tools and techniques for those with little or no experience as planners.
---

- NO[+47 4000 4707](tel:+47%204000%204707)
- US[+1 (607) 218 5952](tel:+1%20(607)%20218%205952)
- UK[+44 7747775505](tel:+44%207747775505)

[![Safran - Master Logo](https://www.safran.com/hs-fs/hubfs/60.%20Internal%20-%20Safran%20Branding%20-%200522/60.%20Internal%20-%20Safran%20Branding%20-%200522%20-%20Master%20Logos/Safran%20-%20Master%20Logo.png?width=1047&height=291&name=Safran%20-%20Master%20Logo.png "Safran - Master Logo")](https://www.safran.com/hubfs/60.%20Internal%20-%20Safran%20Branding%20-%200522/60.%20Internal%20-%20Safran%20Branding%20-%200522%20-%20Master%20Logos/Safran%20-%20Master%20Logo.png)

# Planning Concepts

An introduction to planning concepts for those with little or no experience as planners. Ideal for new planners, project managers, trainees and engineers.

## Course covers:

What planning is and why it is essential on projects, Schedule types, Building a network, Planning tools (float, baselines, etc.), Progress reporting, Introduction to Earned Value, and more.

 

**Location** | Stavanger (Norway)

**Dates** | On request - contact [training@safran.com](mailto:training@safran.com)

**Duration** | 1 day

[< back to events](https://www.safran.com/events)