<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=150057&amp;fmt=gif">

Safran Blog

Our project management and schedule risk analysis experts share their knowledge.

Top Tips for Shutdown Project Scheduling

Shutdown projects, also known as turnarounds, planned outages or STOs are a distinctive and demanding type of project. Stakes are high, as is pressure on the schedule and project team. They are typically costly, short in duration, high risk, require a large number of human resources (including a substantial proportion of sub-contractors), and have a significant focus on HSE (health, safety and environment). The complexity of these projects dictates a sound process for planning and executing. Meanwhile, the pressure on schedule and overall duration turn them into the formula 1 of project execution and control. 

10th January 2018 Read more

Shutdown and Turnaround Success Comes From Safran Project 7

In our previous post we outlined several of the difficulties associated with managing shutdowns, turnarounds and outages (STOs). If this type of project is not properly planned and controlled, a company is at risk of serious budget overruns and schedule delays. Safran Project 7 is designed to assist organizations with streamlining STO planning and execution—fully integrated with SAP to form a comprehensive solution.

02nd February 2016 Read more

You might also be interested in: