In our latest download, we collaborate with Dr. David Hulett to define cost and schedule risk.
Welcome to Safran's Project and Risk Management Blogs
Strategic decision making with integrated master risk schedules
IntroductionA brief walk though of how to develop risk models that provide confidence in achievement of project outputs, programme.
Posts About Schedule Risk Analysis
Many Risk Management practitioners tend to stop the Schedule Risk Analysis (SRA) once the P Dates.
Stay updated with our monthly blog newsletter, notifications before webinars and other educational content.
3 Common Mega Project Scheduling Mistakes
Over 65% of mega projects fail, and scheduling errors are a key factor. We recognise that,.
How to Improve Project Management Using What-if Scenerio Analysis
A project schedule is a prediction of future outcomes or states, for example: "by May 18th we will.
Why Faster Risk Analysis Software Can Save Your Next Project
Risk management professionals add value throughout the life cycle of a project by validating risk.
Boosting project profits: the role of risk management
Owner and director of Redstone Risk Ltd, Will Foulds, introduces his new report which shows that.
AECOM optimises value for its clients using Modern Risk Analysis
Ezinwanyi Kesieme is Associate Risk Manager (Head of Quantitative Modelling) at multinational.
5 steps to improving project outcomes in a rewarding way
Risk and resilience expert, Alexander Larsen,explains why getting the most out of Cost and.
Enabling risk management to drive project success
Donna Festorazzi is Head of Programme Risk Management at Stantec and an internationally experienced.
Risk management to the rescue
Albert ‘Mac’ McMillan project management of 40 years’ experience. His Q&A covers how failing.
New Insight: Performing Integrated Cost and Schedule Risk Analysis on a Multi-Billion Dollar Project
Pacific Northwest National Laboratory (PNNL) tackles some of America’s greatest science and.
What is Project Float? Distributing Slack with Safran Project
Float or slack, when present, is an important asset to any project. It provides flexibility in the.
The Impact of Scope Management on Project Success
Very few projects are ever completed in line with original plans and budgets. Unforeseen changes.
What’s the Difference Between Qualitative and Quantitative Risk Analysis?
Effectiverisk analysisand management are fundamental to project success. Irrespective of the size.
New Insight: What to Look for in Your Cost/Schedule Risk Analysis Software
Cost and schedule risk analysis isfundamental to project success. Whether you’re undertaking a.
What are the Biggest Risks in Project Scheduling?
The Sydney opera house is an incredible feat of architecture. Well ahead of its time when completed.
Why You Need Specialist Software for Aerospace Project Management
Aerospace project management is no mean feat. With so many aspects to juggle and keep control of,.
Why Perform Schedule Risk Analysis?
Practised by thousands of individuals across the world, project scheduling is perhaps the most.
New Download: Managing Uncertainty in Project Schedules
Our latest download looks at the ways in which uncertainty can be managed in project schedules. In.
Integrated Risk Modeling With Safran Risk
Schedule Risk Analysis has developed over many years into a mature discipline with its own set of.
Capturing Uncertainty Through Integrated Risk Modeling
All projects experience unexpected events that can impact their objectives in the form of loss or.
Effective Risk and Contingency Management
Risk and contingency management is one piece of the puzzle whenmanaging a complex project. One of.
Executive Risk Awareness—Critical for Project Success
Following the 2010 BP Deepwater Horizon oil rig explosion in the Gulf of Mexico, a U.S..
Current Trends Within Project Risk Management: Infographic
Earlier this month we published apostabout the current trends within the project risk management.
The Solution to Real-Time Schedule Risk Analysis
Many companies try to do schedule risk analysis calculations within their existing, limited set of.